Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
Newsletters
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation
SubSea
 

JRM Engineering
Mentor Subsea
FloaTEC

Map

Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Batam Island

FABRICATION

 

Engineering
Fabrication
Project Management
Procurement
 
Established on Batam Island, Indonesia, in 1970, this facility has over 37 years of experience in executing engineering-procurement- construction-installation projects, from traditional bottom-founded facilities to floating hulls and their associated topsides. Since operations began, the yard has fabricated more than 600 structures weighing a total of over 694,456 tons. Located on the north coast of Batam Island in the Riau archipelago of Indonesia and just 12 miles south east of the Republic of Singapore, the fabrication facility serves the oil and gas industry in Asia Pacific, as well as export to the Gulf of Mexico, Europe, West Africa and Indian sub-continent. Our facility includes fully equipped prefabrication shops, two pipe rolling mills, and dedicated carbon steel and exotic materials pipe shops. Manned with experienced and highly trained personnel, our skilled workforce is dedicated to meeting the needs of any offshore development project.

Certification

  • ISO9001 certified for fabrication, construction, hook-up and commissioning of onshore and offshore structures, modules, piping and pressure vessels, design of critical lifts and fabrication of associated appurtenances.
  •  
  • ISO 14001 certified Environmental Management System
  • OHSAS 18001 certified Occupational Health and Safety Management System
  • API-2B Monogram (Pipe Mills) - for Fabrication of Structural Pipes
  • SSPC-QP1 (Coating Operations) - For Field Application of Coatings Complex Structures and SSPC-QP3 (Coating Operations) - For Application Of Coatings in Enclosed Environments

     

Fabrication Facility

  • Total Area: 272 acres
  • Fabrication Area: 3.5 acres (covered); 1 acre (open)
  • Warehousing & Storage: 1.3 acres (covered); 103.8 acres (open)
  • Assembly / Erection Area: 1.68 acres (covered); 104 acres (open)
  • Blasting and Painting area: 3.7 acres
  • Office space: 18.3 acres

Bulkhead

  • Total Length: North Yard: 131 feet; South Yard: two bulkheads 600 feet each; FPSO berth 1,280 feet
  • Load Out Capacity North Yard: 27,558 tons; water depth 26.2 feet
  • Load Out Capacity South Yard: 11,023 tons; water depth 19.7 feet
  • Load Out Capacity West Yard: 22046 tons; water depth 29.5 feet
  • FPSO dock offers berthing for vessels up to 300,000DWT; water depth 29.5 feet
  • Quayside Water Depth: North Yard: 28 feet; South Yard: 18 feet
  • Distance to open sea: North Yard: direct access; South Yard: 656 feet
  • Tidal variation: 11 feet (HAT), (-)0.9 feet (LAT)
  • Dredging: harbor dredged to provide minimum depth of 18 feet at LLW and 28 feet at HHW; can be dredged to accommodate a further 5 feet at LLW