Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
Newsletters
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation
SubSea
 

JRM Engineering
Mentor Subsea
FloaTEC

Map

Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Chennai, India
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Batam, Dubai, Jakarta > Project Management

PROCUREMENT

 

Contents:

Overview

J. Ray McDermott operates an international purchasing network, handling purchases in excess of one billion US dollars per year, through which global sourcing and procurement of materials is accomplished to ensure that equipment and materials are provided at the overall lowest landed cost to meet budget, contractual, schedule and quality requirements. The purchasing department is responsible for:

  • Purchasing
  • Expediting
  • Inspection
  • Traffic

Jump to the table of contents

 

Purchasing

The purchasing group ensures that requisitions are received with appropriate specifications and that quotations are issued to "approved" vendors. Final vendor selection is coordinated after client consultation and approval if required.

Assigned buyers negotiate with selected suppliers and issue purchase orders through our in-house computerized Standard Purchase Order & Requisition Tracking System (SPORTS™).

Our buyers deal with vendor order acknowledgements as well as potential re-orders and handle any discrepancies between the supplier's invoice and our original order.

SPORTS:

Procurement functions are processed and in SPORTS. This system is used to control all aspects of procurement, from requisition data entry to receipt of goods at foreign destinations. System output includes purchase orders, procurement plans, expediting reports, manifests, and receiving reports. The system can receive electronic input of bulk material purchase lists and can direct such lists to any McDermott location for ordering. Also, included in SPORTS is the facility to electronically generate priced material lists based on recent past purchases.

Jump to the table of contents

 

Expediting

The expediting department has the prime responsibility for ensuring that purchased items are delivered by the promised dates while verifying that promised deliveries are compatible with vendor shop loads and that progress is in accordance with the agreed plan. In addition to expediting delivery of equipment and materials, expediting also coordinates the delivery of vendor data and drawings. Items critical to the project schedule are vigorously and continually expedited by telephone, fax or email and, where required, visits to vendor manufacturing facilities.

Jump to the table of contents

 

Inspection

The prime responsibility of the inspection department is to ensure that all materials and equipment comply with the requirements ofboth the purchase order and the project specifications. Tests are conducted on materials or equipment to verify compliance with purchase order requirements, using in-house or third-party inspectors, to obtain correct, completed certification for the items or materials inspected.

Inspection of major equipment will typically include the following activities:

  • Pre-inspection meetings - at vendor manufacturing sites, pre-fabrication
  • Interim shop inspections - announced or unannounced, at vendor manufacturing sites
  • Nondestructive examinations
  • Pressure tests
  • Protective coatings
  • Final inspections and acceptance testing
  • Shop testing

Jump to the table of contents

 

Traffic

The traffic department coordinates all material movements to ensure that all material shipping data is entered into the SPORTS system.

This enables traffic personnel to check shipping status, arrange necessary import permits and clearances, verify freight invoices and process damage claims.

Export shipments may be directed to pre-established freight forwarding and export packing locations. The freight forwarding agent/packer has on-line access to SPORTS and is thoroughly familiar with our company packing and shipping requirements.

Jump to the table of contents

 

Site Material Control

A dedicated project procurement coordinator controls all procurement activities for each project.

The company's PC-based Site Material Tracking System controls warehousing and issuance of bulk material and is capable of receiving downloaded information from both the material take-off department and SPORTS.

All purchased and/or client supplied materials are received by the yard warehouse in Jebel Ali or Batam Island and are checked against the purchase orders/delivery list to verify conformity to description and quantity. The materials are inspected to ensure conformity to specification requirements before being logged into SPORTS and the material control systems. Non-conformances, where identified, are also logged into SPORTS for further handling as appropriate.

Jump to the table of contents