Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
Newsletters
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation
SubSea
 

JRM Engineering
Mentor Subsea
FloaTEC

Map

Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Projects

ALLEGHENY FIELD DEVELOPMENT

2nd Mini TLP Installation; EPCI Subsea System

 
Client British-Borneo Exp., Inc.
Region Gulf of Mexico
Location Green Canyon 254, 297 & 298
Water Depth 3310 ft.
Pipeline(s)
  • 12" oil export
Services Performed Front-End Engineering Design, Detailed Engineering, Subsea, Pipelines, Marine Installation
Contractor J. Ray McDermott, Inc.
SeaStar® TLP Supplier Atlantia Corporation
Award March, 1998
Completion August, 1999
Prod. Capacity 25,000 b/d (Oil)
45,000 mmcfd (Gas)
Project Managers Dennis Calkins, P.E.
Key Participants
  • Mentor Subsea Technology Services-
    Subsea & Riser Systems
  • Oceaneering-
    Umbilical and Jumper Installation
  • John E. Chance & Associates-
    Survey
  • Cameron-
    Trees, REM's & Controls
  • Oil States / Hydrotech -
    Connections
  • RMI Titanium-
    Stress Joints

Description:

Five wells, planned among two well centers. Production flows to the SeaStar® mini TLP via individual 4 inch diameter insulated steel catenary risers (SCRs). One well center is situated north-northwest of the platform and the other is to the south-southwest. The well centers are 3,000 feet from the TLP. The TLP contains process equipment and serves as the control center. Two 12 inch SCRs exit the TLP to the north-northwest to export the processed oil and gas.

Innovations:

  • Titanium Tapered Stress Joint used for suspending the SCRs at the TLP
  • High Collapse Resistance (HCR) hoses in a direct hydraulic/electric control umbilical
  • Two years from design concept to first oil
  • Insulated high pressure 4" flowline SCRs

Scope:

EPIC Contract: Installation of the SeaStar® tension leg platform (TLP), including piled foundations, tendons, hull and deck. JRM is responsible for procuring, designing and installing the flowline/pipeline and subsea systems. Mentor Subsea performed the preliminary design of the subsea system.

JRM managed the detailed design and procured the subsea equipment packages, which included 5 subsea production trees and 2 riser end manifolds (REM) with associated controls, umbilicals, connectors, risers and titanium tapered stress joints. JRM also designed, procured and installed 3 miles of 12" gas export pipelines and 1.7 miles of 12" oil export pipelines, each with 1 mile of 12" SCR. This was all installed using the J-Lay method.

In addition, JRM designed, procured and installed five 4" insulated infield flowlines and SCRs, also using the J-Lay method.

Technology:

  • Riser End Manifold(REM)
  • Retrievable piping manifold
  • Isolates SCR loads to trees and wellheads
  • Pigging from platform w/o total field shutdown
  • Allows future use of risers for satellite production
  • CDTU - Man/Machine Interface through a Direct Hydraulic Control System
  • Interface to Intelligent Downhole Completion System (SCRAM's)
  • Titanium SCR Stress Joints
  • Flowline Coiled Tubing Accessible