Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Projects

AMBERJACK

Eng., Fab., Transportation & Install of Platform CLB

 
Client BP Exploration
Region Carribean Sea
Location Mississippi Canyon 109
Water Depth 1030 ft.
Services Performed Front-End Engineering Design, Detailed Engineering
Contractor McDermott, Inc.
Award July, 1990
Completion September, 1991
Consultants Mustang Eng. - Deck
Project Managers Daniel M. Houser
Key Participants Gulf Marine - Jacket Fab.
Brown & Root - Deck Fab.

Description:

  • Engineering, fabrication, transportation and installation of the MC109 platform. Jacket transported and launched from Intermac 650 and deck transported on Intermac 404. Installed jacket, 12" x 84" skirt piles (422' length) and 30" x 26" conductors to 450' penetration.

Scope:

  • McDermott Engineering, Houston responsible for preliminary engineering and detailed structural engineering, which included preparation of the fabrication bid package and ordering of the structural steel for the piles and all tubulars in jacket.
  • JRM responsible for transportation and installation of jacket and deck, as well as setting H&P drill rig on deck, with the DB50. Responsibilities also included installing conductors with the DB28.

Innovations:

  • Self-uprighting jacket (22,000 s.t.)
  • Launched piles to upend off side of DB50 with rocker system
  • Drove first conductors "Closed Ended" - McDermott Patented Technology

Technology:

  • Used counterweights on deck to artificially shift C.O.G.
  • ROV actuated grouting system with hot-stab back-up