Client
|
BP Migas
|
|
Region
|
Asia Pacific
|
|
Location
|
Indonesia
|
|
Water Depth
|
295 ft.
|
|
Pipeline(s)
|
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Subsea, Pipelines, Marine Installation
|
| Contractor |
P.T. McDermott
Indonesia |
| Award |
July, 2001 |
| Completion |
August, 2003 (scheduled) |
| Yard/Marine
Base |
Batam Island,
Indonesia |
| Total
Weight |
18,700 ST |
| Customer
Shareholders |
ConocoPhillips
Indonesia |
| |
|
Description:
- Engineering, Procurement, Construction, Offshore Installation
(EPCI), and mechanical completion
Scope:
- Lump sum contract for the engineering, procurement, construction,
offshore installation of two wellhead platforms, flowlines
and pipeline end manifolds (PLEMs), an oil-offloading buoy
and a 60-mile 24"gas export pipeline
- In-field pipelines will connect each platform and the
oil-offloading buoy to the FPSO. The FPSO gas export PLEM
will contain connection points for the gas export line and
a tie-in for future regional developments, and the 24"
pipeline will connect the FPSO to a PLEM on the Duyong gas
line
- Total weight of each wellhead platform: 2,200ST (jacket)
and 3,000ST (integrated deck)
|
|
|
 |
|