Client
|
Conoco Indonesia Inc. Ltd.
|
|
Region
|
Indonesia
|
|
Location
|
Belida Field, Natuna, Sea
|
|
Water Depth
|
249 ft.
|
|
Pipeline(s)
|
- 12" x 3 mi. infield
- 8" x 3 mi. infield
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Pipelines, Marine Installation
|
| Contractor |
P.T. McDermott,
Inc. |
| Award |
August, 1991 |
| Completion |
October, 1992 |
| Yard/Marine
Base |
Batam Island, Indonesia |
| Total Weight |
13,118 ST |
Description:
- Engineering, procurement, construction, offshore installation
(EPCI)
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
and offshore installation and commissioning of an eight-pile,
self-contained drilling/production platform and associated
in field pipelines. The drilling/production platform was
designed to produce 200,000 barrel per day of liquids and
105 millions standard cubic feet per day of gas.
|