Client
|
TOTAL Exploration and Production Thailand
|
|
Region
|
Gulf of Thailand
|
|
Location
|
Bongkot Field
|
|
Water Depth
|
246-262 ft.
|
|
Pipeline(s)
|
- 18" x 26.4 mi. flowlines
- 16" x 26.4 mi. flowlines
- 14" x 26.4 mi. flowlines
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Pipelines, Marine Installation
|
| Contractor |
P.T. McDermott
Indonesia |
| Award |
July, 1993 |
| Completion |
May, 1996 |
| Total Weight |
16,457 ST (decks and jackets) |
| Yard/Marine
Base |
Batam Island,
Indonesia |
Description:
- Engineering, procurement, construction & offshore
installation
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
and offshore installation and pre commissioning of Phase
II facilities undertaken in three stages.
Stage I: three, four-leg twelve-slot wellhead platforms
(WP4, WP5 and WP6), and associated in-field flowlines.
Stage II: a four-leg (RP), a three-leg flare platform
(FP), and interconnecting bridges.
Stage III two four leg, two twelve-slot wellhead platforms
(WP7 and WP8) and associated in-field flowlines.
|