Client
|
TOTAL Exploration and Production Thailand
|
|
Region
|
Gulf of Thailand
|
|
Location
|
Bongkot Field
|
|
Water Depth
|
256 ft.
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Marine Installation
|
| Contractor |
P.T. McDermott
Indonesia |
| Award |
March, 1997 |
| Completion |
August, 1998 |
| Total Weight |
1,598 ST (module) |
| Yard/Marine
Base |
Batam Island,
Indonesia |
Description:
- Engineering, procurement, construction, offshore installation
(EPCI)
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
and offshore installation, to upgrade existing Bongkot production
capacity by adding a third compression train to the Bongkot
Complex, complete with associated increases and modifications
to process, electrical, utility and fire water systems.
Innovation:
- Fast track schedule with engineering, procurement, fabrication
and offshore work all progressing simultaneously, with all
offshore works performed under hot work permit system on
a live gas producing complex.
|