Client
|
TOTAL Exploration and Production Thailand
|
|
Region
|
Gulf of Thailand
|
|
Location
|
Bongkot Field
|
|
Water Depth
|
246-262 ft.
|
|
Pipeline(s)
|
- 14" x 7.17 mi. infield
- 6" x 7.17 mi. infield
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Pipelines, Marine Installation
|
| Contractor |
P.T. McDermott,
Inc. |
| Award |
January, 1991 |
| Completion |
May, 1993 |
| Yard/Marine
Base |
Batam Island, Indonesia |
| Total Weight |
19,621 ST |
Description:
- Engineering, procurement, construction, offshore installation
(EPCI)
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
and offshore installation and pre commissioning of an eight-pile
gas production platform, three four-leg wellhead platforms
(WP1, WP2 and WP3), a four-pile 150-man living quarters
platform, interconnecting bridges, associated in-field pipelines
and floating storage and offloading vessel (FSO) mooring
system.
|