Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
Newsletters
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation
SubSea
 

JRM Engineering
Mentor Subsea
FloaTEC

Map

Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Projects

CHINOOK DEVELOPMENT

Production Facility

 
Client Mobil Exploration & Producing, U.S., Inc.
Region Gulf of Mexico
Location Main Pass 283 & Viosca Knoll 734
Water Depth 303-320 ft.
Services Performed Detailed Engineering, Fabrication, Marine Installation
Contractor J. Ray McDermott, Inc.
Award October, 1997
Completion October, 1998

Design

JRM Engineering - New Orleans

Prod. Capacity

15,000 bbl/day Oil
150MMCFD Gas

Description:

  • 4 Pile, 6 Well D & P Platform at MP 283 (303’ WD)
  • 3 Pile, 4 Well Protector Platform at VK 734 (320’ WD)
  • Jackets and Decks installed by Lift


Innovation:

  • 340’ Tripod at VK 734 installed by DB101 using a 2 hook upend method, which eliminated the flooding system and closure pates.
  • The 150 ton Quarters building on the MP 283 deck was utilized as a counterweight to maintain a level lift. (see photo)
  • The main deck components were reused from a salvaged deck provided by Mobil.
  • Numerous pre-existing jackup spud can depressions
    dictated the geometry and orientation of both structures.

Technology:

  • The 3900 ton MP 283 deck was installed by the SLC5000 over an existing wellhead. (see photo)
  • The soil consultant provided cone penetrometer results at MP 283 to reduce the pile depth in a deep hard sand layer.