Client
|
Dresser Kellogg Energy Services, Ltd. and Mossgas (Pty) Ltd. Alliance
|
|
Region
|
South Africa
|
|
Location
|
Bredasdorp Basin
|
|
Water Depth
|
328 ft.
|
|
Services Performed
|
Fabrication, Marine Installation
|
| Contractor |
J. Ray McDermott
Middle East, Inc. |
| Award |
February, 1999 |
| Completion |
January, 2000 |
| Yard/Marine
Base |
Jebel Ali,
Dubai, United Arab Emirates |
| Total
Weight |
367 ST |
Description:
- Construction and transportation
|
Scope:
- Lump sum contract for the construction and transportation
of a 177ft long unmanned control buoy. The hull was constructed
in sections, which were vertically stacked before the entire
structure was rotated horizontally for load-out and transportation.
Innovation:
- First of a kind - First control buoy to be fabricated
in Jebel Ali yard.
|