|
Client
|
Reliance Industries, Inc.
|
|
Region
|
West Africa
|
|
Location
|
Reliance Hazira Offshore Terminal
|
|
Water Depth
|
82 ft.
|
|
Pipeline(s)
|
- 24" x 6 mi. pipeline
- 18" x 6 mi. pipeline
|
|
Services Performed
|
Subsea, Pipelines, Marine Installation
|
| Contractor |
J. Ray McDermott
Middle East, Inc. |
| Award |
August, 1994 |
| Completion |
May, 1995 |
| Yard/Marine
Base |
Jebel Ali,
Dubai, United Arab Emirates |
Description:
|
Scope:
- Lump sum contract to install a single point mooring system
(SPM), with two pipelines (24” and 18” diameter)
connecting the SPM to the onshore Reliance petrochemical
complex.
|