Client
|
ACT Operators Group
|
|
Region
|
China
|
|
Location
|
Huizhou Field
|
|
Water Depth
|
121-364 ft.
|
|
Pipeline(s)
|
- 12" x 31.85 mi. infield
- 6" x 31.85 mi. infield
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Pipelines, Marine Installation
|
| Contractor |
P.T. McDermott,
Inc. |
| Award |
June, 1989 |
| Completion |
July, 1991 |
| Yard/Marine
Base |
Batam Island, Indonesia |
| Total Weight |
19,508 ST |
Description:
- Engineering, procurement, construction, offshore installation
(EPCI)
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
and offshore installation and pre commissioning of an eight-pile
self contained drilling/ production platform. Comprising
an eight-leg jacket topsides workover drilling unit, gas
lift compressor module, water injection package, 50-man
living quarters module, low flow pipeline start-up heater
package, water treatment facility (CPI/DGF), four gas turbine
driver generator sets and associated in-field pipelines.
|