Client
|
Marathon Oil Co.
|
|
Region
|
Gulf of Mexico
|
|
Location
|
Ewing Banks 873A
|
|
Water Depth
|
772 ft.
|
|
Services Performed
|
Front-End Engineering Design, Detailed Engineering, Marine Installation
|
| Contractor |
J. Ray McDermott, Inc. |
| Award |
January, 1993 |
| Completion |
July, 1994 |
| Consultants |
J. Ray McDermott Engineering |
| Project Managers |
Kirt Raymond |
| Customer
Partners |
Texaco |
| Prod. Capacity |
40,000 bopd
40 mmscfd |
Description:
- 12 skirt pile drilling and production platform with accommodations
for 74 to support both production and drilling crews.
Scope:
- Separate contracts, with JRM Engineering being responsible
for detailed structural and facilities engineering.
- JRM fabrication responsible for jacket and deck construction.
- JRM Marine responsible for installation of drilling and
production platform including template over pre-drilled
wells.
|
Innovations:
- DB50 / SLC5000 combined 5000 ton lift making it the heaviest
in the Gulf of Mexico.
Technology:
- MHU 195 and MHU 1700 underwater hammers
- Specialized conductor work deck
- Set template / stab and drive piles with DB50 #2 block
- Grout density probe
|