Client
|
BP Exploration
|
|
Region
|
Gulf of Mexico
|
|
Location
|
Green Canyon 782
|
|
Water Depth
|
4500 ft.
|
|
Services Performed
|
Fabrication
|
| Contractor |
J.Ray McDermott,
Inc. |
| Award |
November, 2000 |
| Completion |
2004 |
| Partners |
BHP Billiton
Unocal |
| Project
Manager |
Stephen Thibodeaux |
| Key
Participants |
Pipe Spooling
- Shaw Group
E&I - MMR, Inc. |
| Prod.
Capacity |
80 MBopd -
Oil
40 MMscfd - Gas |
Scope/Description:
- Mad Dog will be 16-slot truss spar providing a dry-tree
environment for production of oil and gas, as well as provide
a host facility for future subsea developments. Production
equipment, a drilling rig, and permanent quarters for both
drilling and production personnel will be located on the
spar.
- Spar will be a single piece structure with a total payload
of approximately 18,000 short tons excluding hull storage
- The topsides are designed around a single-lift integrated
deck concept with a lift weight of approximately 8,400 short
tons.
|
 
Innovation:
- Mad Dog is one of four major BP deepwater projects for
the Gulf of Mexico under construction at the company’s
Morgan City facility which is under exclusive use for BP.
|