Client
|
Enron OIl and Gas India Limited
|
|
Region
|
India
|
|
Location
|
Panna and Tapti Fields
|
|
Water Depth
|
180 ft.
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Marine Installation
|
| Contractor |
J. Ray McDermott
Middle East, Inc. |
| Award |
January, 1996 |
| Completion |
May, 1997 |
| Total Weight |
23,534 ST |
| Yard/Marine
Base |
Jebel Ali,
Dubai, United Arab Emirates |
Description:
- Engineering, procurement, construction & offshore
installation
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
and offshore installation and pre commission the Panna facilities,
comprising an eight-pile process platform, living quarters
platform, two wellhead platforms, flare platform, three
interconnecting bridges.
Innovation:
- The Menck MHU-5000T hydraulic hammer was used for the
first time to pile the 11,000ST piles. The fabrication of
the five platforms took ten months
|