Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
Newsletters
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation
SubSea
 

JRM Engineering
Mentor Subsea
FloaTEC

Map

Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Projects

POMPANO II

Installation of Insulated Pipelines

 
Client BP Exploration
Region Gulf of Mexico
Location Mississippi Canyon 28
Water Depth 1830 ft.
Services Performed Procurement, Front-End Engineering Design, Detailed Engineering, Pipelines, Marine Installation
Contractor J. Ray McDermott, Inc.
Award May, 1994
Completion April, 1996
Project Mgr. Chuck Hebert
Key Participants Oceaneering, Cameron, GEC
Mainfold

Installed 10 Well - 4 Piles Manifold

Description:

  • Remote tie back of well site 4 miles from host platform at Viosca Knoll 989

Innovation:

  • Dual lay of TFL, pipeline and umbilicals
  • Pipelines laid side by side on same reel
  • Deepest Multiple J-Tube Pull
  • Pigged TFL lines with Gel pig to remove mill scale and debris while on reel
  • Installation of dual pipeline tie-in sleds
  • Installed concrete mats utilizing ROV
  • Deepwater pipeline repair utilizing rigid pipe jumper
  • Retrofit anodes with ROV

Scope:

  • Conventional Contract that included risk/ reward provisions, with J. Ray McDermott responsible for installation.

Technology:

  • Installed pipe coated with 22MM polypropylene utilizing reeled pipe method
  • TFL technology used in reeled pipe application
  • Installed high strength steel pipe utilizing the reeled pipe method
  • Developed methods for mechanical testing of pipe prior to reeling
  • Developed acceptance criteria for welding of high strength steel pipe to be reeled
  • Developed transition for wall thickness change for reeling high strength steel pipe