Client
|
Ras Laffan LNG Company Limited (II)
|
|
Region
|
Arabian Gulf
|
|
Location
|
Qatar
|
|
Water Depth
|
213 ft.
|
|
Pipeline(s)
|
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Subsea, Pipelines, Marine Installation
|
| Contractor |
J. Ray McDermott
Middle East, Inc. |
| Award |
October, 2002 |
| Completion |
October, 2004 (scheduled)
|
| Yard/Marine
Base |
Jebel Ali, Dubai, United
Arab Emirates |
|
|
Description:
- Engineering, Procurement, Construction, Offshore Installation
(EPCI), and mechanical completion
|
Scope:
- Lump sum contract for the engineering, procurement, construction,
offshore installation, and mechanical completion of one
12-slot platform of increased capacity. Plus the offshore
installation of a 4-mile 28” subsea pipeline from
WH5 to the existing WH7, and installation of a subsea power
and fiber optic cable from WH5 to the RasGas Alpha RT platform.
|