|
Client
|
Shell Offshore, Inc.
|
|
Region
|
Gulf of Mexico
|
|
Location
|
Garden Banks 172B
|
|
Water Depth
|
693 ft.
|
|
Pipeline(s)
|
|
|
Services Performed
|
Project Management, Procurement, Detailed Engineering, Fabrication, Marine Installation
|
| Contractor |
J. Ray McDermott, Inc. |
| Award |
October, 1996 |
| Completion |
December, 1997 |
| Consultants |
Shell EPCE - Houston
Alliance Eng. - Deck |
| Project Managers |
Jim Ermon - Offshore
Jay Machen - Fab |
| Key Participants |
Oil States MCS - HydraLok;
Oceaneering - ROV;
John Chance & Assoc. - Survey
|
Description:
- Transportation & installation of 4-leg, 8 skirt pile
jacket (approx. 10,000 ST) with DB50
- Transport & install approx. 2,500 s.f. deck with flare
boom
- Transport & install 9 conductors
- Transport & install drill rig and quarters
Scope:
- Lump sum contract, with JRM responsible for the transportation
and installation of the platform
|
Technology:
- Pile installation will utilize the "Latch-Lok"
leveling system and the "Hydra-Lok" swaging method.
|