Client
|
British Petroleum Explroation Ltd.
|
|
Region
|
Caspian Sea
|
|
Location
|
Azerbaijan sector
|
|
Water Depth
|
400 ft.
|
|
Pipeline(s)
|
- 26" x 57 mi. gas
- 12" x 57 mi. condensate
- 4" x 57 mi. MEG
|
|
Services Performed
|
Pipelines, Marine Installation
|
| Contractor |
J. Ray McDermott
Middle East, Inc. |
| Award |
February, 2003 |
| Completion |
August, 2006 (scheduled) |
| Yard/Marine
Base |
Baku Deepwater Jacket
Factory,
Baku, Azerbaijan |
Description:
|
Scope:
- Lump sum contract for the transportation and offshore
installation of 57 miles 26” gas pipeline, and 57
miles 12” condensate pipeline, and a 4” diameter
MEG pipeline (piggybacked to the 12” pipeline) approximately
57 miles long.
- During the pipelay contract, significant local Azerbaijani
infrastructure will be utilized including key marine support
vessels - provided by Kaspmornefteflot (KMNF), SOCAR’s
marine operations group. The pipelay barge Israfil Huseynov
is free-issued to MCCI by AIOC through their Charter Party
Agreement with SOCAR.
|