Client
|
W & T Offshore
|
|
Region
|
Gulf of Mexico
|
|
Location
|
Eugene Island Block 397
|
|
Water Depth
|
470 ft.
|
|
Services Performed
|
Procurement, Detailed Engineering, Fabrication, Marine Installation
|
| Contractor |
J. Ray McDermott,
Inc.
Engineering - New Orleans |
| Fab
/ Install Constractor |
J. Ray McDermott,
Inc.
Morgan City |
| Award |
January, 2001 |
| Project
Installation |
October, 2001 |
| Project
Manager |
Bobby
Foret |
| Prod.
Capacity |
10,000
b/d, 50,000 cfd |
Scope:
- Lump Sum EPCI contract, with JRM being responsible for
designing, procuring, fabricating and installing the tripod
jacket and 4-leg deck.
Description:
- The three-leg platform, or tripod, will be located 130
miles southwest of Morgan City, Louisiana in 470 feet of
water. It will be a 12-well structure capable of supporting
a self-contained drilling rig and equipment. The skirt pile
founded jacket will weight 2,700 tons and the deck 700 tons.
The structures are being designed by J. Ray McDermott Engineering
in New Orleans and will be fabricated at J. Ray McDermott's
facility near Morgan City. From designing and fabricating
to installation, the project is expected to be completed
in 10 1/2 months. J. Ray McDermott's Derrick Barge 50 is
scheduled to install the structure. The W & T project
will be the third deepest tripod in the Gulf of Mexico
|
|
|
 |
|