Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
Newsletters
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation
SubSea
 

JRM Engineering
Mentor Subsea
FloaTEC

Map

Altamira, Mexico
Baku, Azerbaijan
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Supplier Registration

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesSuppliersContact Us Search
 
Home > Projects

PROJECTS

Projects menu See grid of services performed Alphabetical list of projects
See projects by water depth See projects by client and other info
Get a pivot table of pipeline dimensions See projects by region
Advanced Project Search

Pipeline Information

The following table shows pipeline dimensions for featured pipeline projects. You can "pivot" the table by clicking the link below to swap diameter and length. Click on a project name to read its detail page. Use the Projects menu above for project graphs and tables, or for an advanced search.

Printer-friendly version

  Diameter (in.)
Pivot the table (put Length on X-axis)
Project
 Depth (ft.)  Pipe Info
0-9 10-19 20-29 30-39 40-49 50 +
3rd LNG Train 160 4-in. 30.5-mi. oil           
Al Khaleej Gas
Project
213 38-in. 60-mi.            
Allegheny Field
Development
3310 12-in. oil export           
Aspen 1350-3100 5.62-in. 15-mi. umbilical and UTA           
see above see above 7-in. 15-mi. Pipeline           
Auger 2860 12-in. 36-mi. gas           
see above see above 12-in. 72-mi. oil           
Azerbaijan 30 and 28
Pipelines
427 18-in. 7.1-mi. Pipeline           
see above see above 28-in. 116-mi. Oil Pipeline           
see above see above 30-in. 116-mi. Gas Trunkline           
Belanak Wellhead and
Pipelines
295 24-in. 60-mi. gas export           
Belida DPP-A
Platform
249 8-in. 3-mi. infield           
see above see above 12-in. 3-mi. infield           
Black Lion Phase 1 8-in. 6.2-mi. 1 pipeline           
see above see above 12-in. 6.2-mi. 1 pipeline           
see above see above 14-in. 6.2-mi. 2 pipelines           
Bongkot Field Development (Phase
II)
246-262 14-in. 26.4-mi. flowlines           
see above see above 16-in. 26.4-mi. flowlines           
see above see above 18-in. 26.4-mi. flowlines           
Bongkot Phase 1 246-262 6-in. 7.17-mi. infield           
see above see above 14-in. 7.17-mi. infield           
Brutus Pipelines 325-3000 18-in. 1.1-mi. gas SCR           
see above see above 18-in. 1.1-mi. oil SCR           
see above see above 18-in. 1.5-mi. oil           
see above see above 20-in. 23.2-mi. gas           
see above see above 20-in. 23.3-mi. oil           
Brutus TLP 3000 18-in. 1.75-mi. oil SCR           
see above see above 18-in. 1.75-mi. oil SCR           
see above see above 20-in. 21.72-mi. gas           
see above see above 20-in. 24.57-mi. oil           
Carina & Aries 1-300 18-in. 3.5-mi. Export pipeline           
see above see above 24-in. 4.5-mi. Export pipeline           
Crosby 3800-4400 8-in. 10-mi. pipe-in-pipe           
see above see above 12-in. 10-mi. pipe-in-pipe           
Discovery Pipeline 15-775 18-in. 21.6-mi. buried           
see above see above 18-in. 26.2-mi. laid           
see above see above 30-in. 47.2-mi. buried           
see above see above 30-in. 69.7-mi. laid           
East Breaks 112
Development
960 4-in. 6-mi. single           
see above see above 4-in. 11-mi. dual           
East Spar Pipelines 26-315 14-in. 34.2-mi.            
Garden Banks 388 2100 8-in. 2-mi. oil           
see above see above 12-in. 0.33-mi. gas           
see above see above 12-in. 54-mi. dual           
Habanero 2000-2860 6-in. 11-mi. 2           
see above see above 10-in. 11-mi. 2 PIP           
Hazira SPM
Installation
82 18-in. 6-mi. pipeline           
see above see above 24-in. 6-mi. pipeline           
Huizhou 26-1 121-364 6-in. 31.85-mi. infield           
see above see above 12-in. 31.85-mi. infield           
I-PQSU 246-279 8-in. 11.4-mi. pipelines           
see above see above 10-in. 11.4-mi. pipelines           
see above see above 12-in. 11.4-mi. pipelines           
see above see above 30-in. 11.4-mi. pipelines           
King Pipelines 3300 10-in. 3-mi. dual pipelines           
see above see above 12-in. 3-mi. dual pipeline end sleds           
KRA and KG
Development
289 10-in. 14.43-mi. Infield           
Llano 2500-2860 6-in. 10.5-mi. 2 SCR           
see above see above 12-in. 10.5-mi. 2 PIP           
Maharaja Lela
Jamalulalam
200 12-in. 54-mi. Gas pipeline           
see above see above 18-in. 54-mi. Pipeline           
Mars 2940 14-in. 116-mi. gas           
see above see above 18-in. 116-mi. oil           
Mobil NSO A 354 30-in. 63.24-mi. Gas Transmission           
Morpeth Field
Development
1690 8-in. 19-mi. gas           
see above see above 12-in. 19-mi. oil           
Neptune 1930 8-in. 35-mi.            
Pailin Phase 1 246 8-in. 51.7-mi. In-field flowlines           
see above see above 10-in. 51.7-mi. In-field flowlines           
see above see above 16-in. 51.7-mi. In-field flowlines           
Qatar Petroleum MM105 WHJ Platform and
Pipelines
-117 6-in. 3.18-mi. Low pressure bulk flowline           
see above see above 8-in. 3.18-mi. gas lift pipeline           
Ram-Powell 3214 12-in. 30-mi. oil           
see above see above 14-in. 23-mi. gas           
Ras Gas WH5 213 28-in. 4-mi.            
Salsa 693 12-in. 3-mi.            
see above see above 14-in. 3-mi.            
Sangu Field
Development
50 20-in. 30-mi. Transport           
Santan STA Platform 125 12-in. 37-mi. pipeline           
see above see above 16-in. 37-mi. pipeline           
see above see above 24-in. 37-mi. pipeline           
see above see above 36-in. 37-mi. pipeline           
Saudi Arabian 1999 Platforms Pipelines and
Cables
20-164 10-in. 10.56-mi. pipeline           
see above see above 12-in. 10.56-mi. pipeline           
see above see above 16-in. 10.56-mi. pipeline           
see above see above 24-in. 10.56-mi. pipeline           
Serrano & Oregano 2800-3400 6-in. 6.6-mi. pipe-in-pipe and SCR           
see above see above 6-in. 8.2-mi. pipe-in-pipe and SCR           
see above see above 10-in. 6.6-mi. pipe-in-pipe and SCR           
see above see above 10-in. 8.2-mi. pipe-in-pipe and SCR           
Shah Deniz 400 4-in. 57-mi. MEG           
see above see above 12-in. 57-mi. condensate           
see above see above 26-in. 57-mi. gas           
Train 3 Expansion
Project
226 38-in. 62-mi. Export           
Trinidad Upstream
Development
285 12-in. 10-mi. tied-in 12" trunkline           
see above see above 12-in. 65-mi. beach pull (0-285' W.D.)           
see above see above 18-in. 10-mi. tied-in           
see above see above 20-in. 10-mi. tied-in 40" trunkline           
see above see above 40-in. 65-mi. beach pull (0-285' W.D.)           
Typhoon 2100 12-in. 17.4-mi. Oil Export           
see above see above 20-in. 34.5-mi. Gas Export           
Upstream Development 3rd LNG
Train
160 20-in. 3.73-mi.            
Ursa 4000 18-in. 47-mi. oil